London Data Center Co-Location - Power Supply Switchover

Scheduled Maintenance Report for Global Flex Status

Completed

The scheduled maintenance has been completed.
Posted Aug 24, 2026 - 23:00 UTC

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Aug 24, 2026 - 22:00 UTC

Update

We will be undergoing scheduled maintenance during this time.
Posted Aug 24, 2026 - 15:06 UTC

Update

We will be undergoing scheduled maintenance during this time.
Posted Aug 21, 2026 - 12:28 UTC

Update

We will be undergoing scheduled maintenance during this time.
Posted Aug 20, 2026 - 00:01 UTC

Scheduled

Mitel will be manually switching network equipment from PDU A to PDU B in preparation for a scheduled maintenance the following night where the PDU A power supply will be isolated for Annual Electrical testing.
This maintenance will affect only those Customer/Partner Devices that gave only one physical power supply installed. The affected devices will power cycle for approx 10 minutes, at which time any services connected through said device will be down.
The total window is set for 1 hours

The maintenance window has now moved to 22:00 UTC - 23:00 BST
Posted Aug 19, 2026 - 23:59 UTC
This scheduled maintenance affected: EMEA (London - MiCloud Flex Services Network Connectivity).