All Systems Operational
About This Site
This page provides the status of Mitel Flex Services
For Mitel CloudLink status updates, please visit: https://status.mitel.io
APAC
Operational
Sydney - MiCloud Flex Services Network Connectivity
Operational
Sydney - MiCloud Flex Virtual Compute Environment
Operational
Melbourne - MiCloud Flex Virtual Compute Environment
Operational
Mitel Performance Analytics (FlexAPAC)
Operational
EMEA
Operational
London - MiCloud Flex Services Network Connectivity
Operational
London - MiCloud Flex Virtual Compute Environment
Operational
Manchester - MiCloud Flex Services Network Connectivity
Operational
Manchester - MiCloud Flex Virtual Compute Environment
Operational
Mitel Performance Analytics (FlexEU)
Operational
North America
Operational
Reston - MiCloud Flex Services Network Connectivity
Operational
Reston - MiCloud Flex Virtual Compute Environment
Operational
Dallas - MiCloud Flex Services Network Connectivity
Operational
Dallas - MiCloud Flex Virtual Compute Environment
Operational
Mitel Performance Analytics (MCS - Global)
Operational
Mitel Performance Analytics (FlexNA)
Operational
Flex Services GLOBAL
Operational
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Scheduled Maintenance
London Flex DC Facility - HW Maintenance (8pm BST) Sep 10, 2026 19:00-21:00 UTC
Work Description:
Our engineering team will replace a failed Power Supply Unit (PSU) in an edge switching device equipped with dual redundant power supplies. The failed PSU is hot-swappable, allowing the replacement to be performed while the device remains powered and operational.
Expected Impact:
No service disruption is expected during this maintenance. The device will continue operating on the remaining PSU while the faulty unit is replaced.
This switch serves only one customer private MPLS connection - Customers using Partner NNI services do not use this switching device
Posted on Sep 03, 2026 - 13:17 UTC
Our engineering team will replace a failed Power Supply Unit (PSU) in an edge switching device equipped with dual redundant power supplies. The failed PSU is hot-swappable, allowing the replacement to be performed while the device remains powered and operational.
Expected Impact:
No service disruption is expected during this maintenance. The device will continue operating on the remaining PSU while the faulty unit is replaced.
This switch serves only one customer private MPLS connection - Customers using Partner NNI services do not use this switching device
Posted on Sep 03, 2026 - 13:17 UTC
